Sha Tin to Central Link

Sha Tin to Central Link
沙田至中環線

No. of stations 10
Type Heavy rail
Districts Sha Tin, Wong Tai Sin, Kowloon City, Wan Chai, Central and Western
Voltage AC 25000 V, 50 Hz
Track gauge 1435 mm
Bold font indicates existing station
Italic font indicates station under construction or planning
 North-south Line (East Rail Line
Sha Tin
 East-west Line (Ma On Shan Line
Tai Wai
Tai Wai Depot
Hin Keng
Kowloon Tong
Diamond Hill
 Kwun Tong Line 
Diamond Hill Stabling Sidings
Kai Tak
To Kwa Wan
Ma Tau Wai
Mong Kok East
 Tsuen Wan Line 
Yau Ma Tei
Ho Man Tin
Hung Hom (Through Train terminus)
Whampoa
Jordan
Tsim Sha Tsui
East Tsim Sha Tsui
4th cross-harbour railway tunnel
Exhibition
 Island Line 
1st cross-harbour railway tunnel
Admiralty
 South Island Line (east) 
Central
 Island Line 
Hong Kong
3rd cross-harbour railway tunnel
Austin, Kowloon
(West Kowloon Terminus)
Olympic
Nam Cheong
 Airport Express 
 Tung Chung Line 
 East-west Line (West Rail Line

Shatin to Central Link (Chinese: 沙田至中環線, also called as 沙中線) is a proposed railway line in Hong Kong which will run from Tai Wai Station in Tai Wai to Hung Hom. The original proposal had this line running to Central, but this will now be an extension of the East Rail Line.

The proposed route roughly follows the East Kowloon Line (東九龍綫), which was proposed in the late 1960s. The railway will be operated by the MTR Corporation Limited and the final draft proposal issued to the government by end of 2007. Construction is planned to start no later than 2010 and operation to begin in 2015 (Hung Hom section).[1]

Originally, construction and operation were awarded to the Kowloon-Canton Railway Corporation (KCRC) after a bidding process. However, as the Hong Kong Government leased KCRC's transport operations to the MTR Corporation Limited (MTRCL), KCRC's sole rival in the bidding, the railway will be operated by the MTRCL upon completion of construction.

Contents

History

On 25 June 2002, the government announced that the Kowloon-Canton Railway Corporation (KCRC) had won its bid against the MTR Corporation Limited (MTRCL) to build and operate the Shatin to Central Link. The route was originally planned to go from Tai Wai Station to Central West Station (a proposed station located under the Mid-Levels).

The KCRC announced modifications to the proposal in 2005, with the East Kowloon portion of the line joining KCR Ma On Shan Rail (Ma On Shan Line) at Tai Wai and West Rail (West Rail Line) at Hung Hom, and the cross-harbour portion joining KCR East Rail (East Rail Line) at Hung Hom. However, the KCRC's proposal had not yet been finalised.

At the same time, the MTRC submitted a new proposal to the government. According to the proposal, Kwun Tong Line would be extended from Yau Ma Tei Station to Whampoa Station in Whampoa Garden. Also, the route of Shatin to Central Link will be built according to the original proposal instead of the KCRC's modified proposal.

On 11 April 2006, MTRC signed a non-binding memorandum of understanding with the Hong Kong Government, the owner of KCRC, to merge the operations of the territory's two railway networks. According to the memorandum, the current MTR lines may be fully integrated with the Shatin to Central Link. Also, the government intends to choose the KCRC's modified proposal to build the railway, that is, extending the current East Rail Line to the Hong Kong Island. However, final decisions will not be made before conducting further studies on the proposal with the MTRC.

On 12 July 2007, both companies announced the new proposal .[2]

KCRC's original proposal

Ma On Shan Rail Extension (Tai Wai to Central West)

Originally, the KCRC chose to extend the current Ma On Shan Line from Tai Wai to Central West via stations in East Kowloon and northern shore of the Hong Kong Island in the original bid for the line.

The following is a list of proposed stations in the KCRC's original bid for the line:

KCRC's modified proposal

In 2004, the KCRC sent a modified proposal of the railway to the government. According to the proposal, Ma On Shan Line will be extended to East Kowloon and join West Rail Line at Hung Hom. In addition, the cross-harbour portion will become an extension of East Rail Line, running from Mong Kok to Central South.

Ma On Shan Rail East Kowloon Extension (Tai Wai to Hung Hom)

Ma On Shan Line will be extended from Tai Wai to Hung Hom via East Kowloon. The extension will join West Rail Line at Hung Hom to the northwest New Territories via the Kowloon Southern Link and the current route of West Rail Line, forming an East-to-West railway corridor. Also, the KCRC had decided not to build stations in Tsz Wan Shan and Whampoa Garden. However, both stations will be linked by the Automatic People Mover from Diamond Hill and Hung Hom respectively.

The following is a list of proposed stations of the Ma On Shan Rail East Kowloon Extension:

Cross-harbour Extension (Mong Kok to Central South)

According to the proposal, a new Mong Kok East station will be relocated a few hundred metres to the south of the current Mong Kok East station. Also, a new underground tunnel will be built to link between Mong Kok East and Hung Hom, which will join the cross-harbour tunnel to the northern shore of Hong Kong Island, forming a North-to-South railway corridor.

The following is a list of proposed stations of the Cross-harbour Extension:

MTRC's proposal

Shatin to Central Link (Tai Wai to Central)

The following is a list of stations proposed in the MTRC's original bid for the line:

An underground train depot would be built beneath the passenger terminal of the former Kai Tak International Airport, adjacent to Prince Edward Road East in Kowloon City.

Kwun Tong Line Extension (Yau Ma Tei to Whampoa)

In addition, the MTRC had previously proposed extending the Kwun Tong Line to Whampoa Garden. As the KCRC had decided not to build a station in Whampoa Garden on the Shatin to Central Link, the MTRC sent this proposal again to the government.

The extension would run from the current Yau Ma Tei terminus to:

MTR-KCR merger proposal

As the MTR and KCR were merging, the two companies announced the new proposal on 12 July 2007.

East-west Line

The stations will be:

North-south Line

The original Causeway Bay North (銅鑼灣北) station was cancelled due to potential effects on traffic during the construction of the station.

Kwun Tong Line extension

MTR-KCR revised proposal

The MTRC announced a revised proposal on 11 March 2008. The Government will fund all of the required HK$37.4 billion for construction.[3]

East-west Line

For the section assigned to East-west Line, the stations will be:

Construction will be started in 2012 and completed in 2018.

North-south Line

The original Causeway Bay North (銅鑼灣北) station was cancelled due to potential effects on traffic during the construction of the station.

Central South (中環南) has not been cancelled, but excluded in the modified plan because no suitable sites have been found at this stage. Construction will be completed in 2020.

Kwun Tong Line extension

Construction will be finished in 2015.

See also

References